Construction is proceeding at MMA with millwork and interior finishes now moving rapidly. Photos from our field visit this week are shown below, clockwise from top:

  1. Approach from south (existing Hurley library at left)
  2. View from adjacent dorm
  3. Wood cladding installation at interior "drum" that houses the bridge simulator
  4. Learning commons at third floor
  5. Installation of subframe for bridge simulator inside the panoramic "drum"