Blog

MMA Progress, 2010.03.01

Progress during this week's site visit includes handrail and guardrail installation, and terrazzo. It is also interesting to note the progress of the exterior solar control indicated in the shadow cast on the red terrazzo floor. You can see how effective this will be at mitigating solar gain once the installation is complete.