Blog

Cost Modeling Workshop at Arkansas Yields Progress on Hillside Auditorium

Perry Dean met this week with the University of Arkansas, and our entire design team to review and discuss the development of the project. The focus was on cost modeling, integration of MEP systems, structural systems, and landscape and civil concerns. It was a great live workshop process that we believe gives us a good jump on managing the cost of the project. Images of the section and plan analysis are shown below.